WE DISCOVER NEW MEHODS TO FLY HIGHER EVERYDAY.
THE HIGHLIGTS OF OUR PREVIOUS WORKS ARE DISCUSSED BELOW:
YEAR
2019
LOCATION
GEORGE BROWN HOUSE
STRUCTURAL ENGINEERS
KAY ZAND P.ENG
OPTIMUM QUEST SOLUTIONS
PROJECT OWNER
ONTARIO HERITAGE TRUST
GEORGE BROWN HOUSE, TORONTO.
RETROFIT AND RESTORATION OF EXTERIOR FIRE EXIT STAIRS.
- Addition of concrete pillars to support bottom of stairs and further securing steel framing to this member,
- Addition of steel X-bracing to columns as the wind loading in the modeling showed some weakness and inadequacy in the existing structure,
- Increased bearing at half-landing by anchor bolting new steel angles to brick walls,
- Additional of Min. 3/4" bolts to steel to steel member with weak joints,
- Issued specs for new and additional anchor bolt connections for any member which is already tied to brick walls. It was decided not to remove any but add to existing.
EXTERIOR FIRE EXIT STAIRS UPGRADED TO MEET TODAY'S STANDARDS AND CODE OF PRACTICES.
YEAR
2022
LOCATION
KANEFF CRES, MISSISSAUGA.
STRUCTURAL ENGINEERS
KAY ZAND P.Eng
PROJECT OWNER
CONDO PROPERTY MANAGERS
CONDOS @ KANEFF CRES, MISSISSAUGA.
(MORE INFORMATION PROVIDED UPON REQ.)
CONDOS @ KANEFF CRES, MISSISSAUGA.
IT IS OUR TURN TO RESTORE CONDOs/RESIDENTIAL/COMMERCIAL/HERITAGE BUILDINGS WITH THE APPLICATION OF NEW TECHNOLOGY. IT’S TIME FOR US TO WORK HARD!